-
[ previous ] -
[ t o p ] -
[ n e x t ] -
CDF Overview : Tevatron Luminosity
- Collaboration
- Detector
- Trigger
- Luminosity
Tevatron Luminosity (delivered)
| base | design |
in 2004 | 0.23fb-1 | 0.32fb-1 |
by end of 2009 | 4.4 fb-1 | 8.5fb-1 |
| achieved | base | design |
Initial Luminosity (E30cm-2s-1) | 72 | 157 | 275 |
Weekly Luminosity (pb-1/week) | 12.2 | 28 | 47 |
Recent Tevatron Operation is really good.
yoshiaki.fujii@kek.jp, Mar.27,2004 at JPS Kyushu