-
[ previous ] -
[ t o p ] -
[ n e x t ] -
CDF Overview
- Collaboration
• 600 Physicists
67 Institutes
11 Countries
• 1981: TDR of CDF
• 1985: First Collision only with CDF
• 1992: Run-I started with D0.
• 1996: Run-I ended.
• 2000: Run-IIa comissioning started.
2001: Physics data taking started.
• 2005: Run-IIb upgrade
- Detector
- Trigger
- Luminosity
yoshiaki.fujii@kek.jp, Mar.27,2004 at JPS Kyushu