MA-PMT tests at Tsukuba (Production tubes, H8711A-10MOD)

Tapered base, isolation resistors, longer and solid pins for TSW.
Batch 1 - 2 - 3 - 4



First batch consists of 30 tubes.

Hamamatsu data sheets

Test setup is identical to that for the pre-prod tubes.

30 tubes tested.
Four (out of 30) were sent to ANL on Oct 16, 2003 : SA0522, SA0457, SA0487, SA0445.
The remaining tubes (except two) were sent to ANL on May 21, 2004, after the tests described here.


Second batch, 92 tubes.

Hamamatsu data sheets


92 tubes tested.
All tubes at Tsukuba as of June 9, 2004.




Third batch, 78 tubes.

Hamamatsu data sheets


78 tubes tested.
All tubes at Tsukuba as of July 7, 2004.
Sent to ANL on Aug , 2004.




Spare batch, 20 tubes.

Hamamatsu data sheets







Last modified: Sun Apr 16 17:57:51 JST 2006